September 2007

 
Sep07_PlantOverview_1.jpg
 Sag and Ball Mill and Rougher Flotation Supports
 Sep07_PlantOverview.jpg   Sep07_SAGMillShell.JPG 
 Rougher Flotation Supports and Concentrate Storage Facility Base
 
 SAG Mill Shells Being Fitted
 Sep07_SAGMillHeadSection.JPG    Sep07_SAGShellInstallation.JPG
 SAG Mill Shells Being Fitted
 Sep07_Mills.JPG    Sep07_BallMillBoltTensioning.JPG
 View of Milling Plant
 
 Tensioning Flange Bolts on Ball Mill
 Sep07_BallMillStatorWindings.JPG    Sep07_BPFuelArea.JPG
 Assembly of Gearless Mill Drive on Ball Mill
 
 BP Fuel Area
 Sep07_FlotationAssembly.JPG    Sep07_PrimaryCrusherReclaimTunnel.JPG
 Flotation Tank Assembly
 
 Primary Crusher and Reclaim Tunnel
 Sep07_HVWorkshop.JPG    Sep07_DC_ChannelR3Crossing_5_1.JPG
 Heavy Vehicle Workshop
 
 Culvert Installation at R3 Road
 Sep07_OverlandConveyor.JPG    Sep07_ReclaimArea.JPG
 Overland Conveyor from Malundwe to Plant Site
 
 Crushed Ore Reclaim Area
 Sep07_LIAClinic_Admin.JPG    Sep07_TailingsThickener.JPG
 LIA Clinic And Admin Area
 
 Tailings Thickener Pump Chamber
 Sep07_ThickenerShaft.JPG    
 Tailings Thickener Column with Thickener Under Construction
   

Share Price

Symbol Last Trade $ Change
ASX EQN 3.770 -0.060
TSX EQN 3.58 0.00

Copper Price

Price (US$/lb) $ Change
3.355 -0.067

ASX and TSX Logos ASX TSX Prices are delayed by at least 20 minutes.
Click a logo to view complete
online share information

Videos

Lumwana Flyover Video 23-May 2008


Contacts

Perth Office

Ground Floor, 50 Kings Park Road
West Perth WA 6005
Tel: +61 (0) 8 9322 3318
Fax: +61 (0) 8 9324 1195

Toronto Office

155 University Avenue, Suite 1701
Toronto, Ontario Canada M5H 3B7
Tel: +1 (416) 865 3393
Fax: +1 (416) 865 3394


Join our mailing list

Click here to join our mailing list and keep up to
date with all the news at Equinox