September 2008

 
Sept2008_1stElectricShovel
   
Sept2008_CrushedMaterialStockpiled
 First electric shovel in operation
 
 Crushed material being stockpiled at plant site
Sept2008_CrushedMaterialStockpiled2
   
Sept2008_CrushedMaterialStockpiledConveyor
 Crushed Material Stockpile
 
 Crushed Material Stockpile and Plant Conveyor System
 
Sept2008_DirectDumpCrushing
   
 Commencement of Direct Dump Crushing
   

Share Price

Symbol Last Trade $ Change
ASX EQN 5.020 +0.010
TSX EQN 4.70 +0.04

Copper Price

Price (US$/lb) $ Change
3.269 0.039

ASX and TSX Logos ASX TSX Prices are delayed by at least 20 minutes.
Click a logo to view complete
online share information


Contacts

Perth Office

Ground Floor, 50 Kings Park Road
West Perth WA 6005
Tel: +61 (0) 8 9322 3318
Fax: +61 (0) 8 9324 1195

Toronto Office

Royal Bank Plaza, South Tower
200 Bay Street, Suite 2940
PO Box 54, Toronto, Ontario
Canada M5J 2J2
Tel: +1 (416) 865 3393
Fax: +1 (416) 865 3394


Join our mailing list

Click here to join our mailing list and keep up to
date with all the news at Equinox